Deck Installation

We frame new decks from the footings up, setting posts on poured concrete footings sized for the soil and the load above them. Joists get hung with galvanized or stainless hangers, sixteen inches on center for most residential decks, and we adjust that spacing for composite boards that need more support.

Deck Repair

We replace individual boards, joists or posts instead of tearing out a whole deck when only part of it has failed. Rot usually starts where a post meets a footing or where a ledger board wasn't flashed, so we check both before we quote a fix.

Deck Staining & Sealing

Pressure-treated pine gets a fresh coat of stain and sealer every one to two years out here, more often on decks that get full afternoon sun. We pressure wash first at a low setting so we don't chew up the wood grain, let it dry a full day or two, then stain.

Custom Deck Design

We'll draw up a deck layout around how you actually use your yard, whether that's a straight run off the kitchen or a multi-level deck stepping down to a pool. We size the framing and pick the railing style before we ever pour a footing, so there are no surprises once material's on order.

Composite Decking

Composite boards like Trex or TimberTech don't rot, splinter or need annual staining, which matters if you'd rather use the deck than maintain it. They do need proper joist spacing and a manufacturer-specified expansion gap between boards, which we follow to the letter so the deck doesn't buckle in the heat.

Deck Railing Installation

Florida code calls for railings at least 36 inches high on most residential decks, with balusters spaced so a 4-inch sphere can't pass through. We build railings to hold that spacing and pass inspection the first time, in wood, cable or aluminum.

Deck Board Replacement

Sometimes the frame underneath is solid and only the decking itself has gone soft or gray. We pull the old boards, check every joist while it's exposed, and lay new decking without touching what doesn't need it.

Deck Cleaning & Pressure Washing

Humidity and shade turn a deck green fast around here, and mildew makes wood slick underfoot. We wash at a pressure low enough to clean without opening up the grain, which is where water gets in and starts rot.

Pool Deck Construction

Pool decks take more splashing, sun and bare feet than a regular deck, so we build them with boards that drain fast and don't hold standing water against the frame. We also keep fastener heads countersunk so nobody catches a toe on a screw.

Screened-In Deck & Porch Additions

A screen enclosure over an existing or new deck keeps the bugs out without losing the outdoor feel. We frame the enclosure to tie into the existing deck structure, not just sit on top of it, so it holds up in wind.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Sarasota, FL

Deck construction and repair covers these communities and the areas between them.

Sarasota, FL
Bradenton, FL
North Port, FL
Port Charlotte, FL
Venice, FL
Palmetto, FL
Punta Gorda, FL
Lakewood Ranch, FL
Englewood, FL
Nokomis, FL
Osprey, FL
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Do I need a permit to build a deck?
Most deck construction over 30 inches off the ground requires a building permit in Florida, and some counties require one regardless of height. Permit application, plan submission and inspection scheduling are all part of the deck construction process.
How long does it take to build a deck?
A standard single-level deck usually takes three to seven days to frame and finish, depending on size and railing complexity. Multi-level decks, pool decks and screened enclosures run longer, sometimes two to three weeks including inspections.
Can a deck be built to fit a specific budget?
Deck size, decking material and railing style can all be adjusted to hit a target budget, and a written quote shows how each choice affects the total. Pressure-treated pine costs less than composite decking, and a simpler railing design costs less than cable or glass panel railing.
Do you guarantee your deck work?
Workmanship on deck construction and repair is guaranteed against defects for a set period after completion, with the specific terms spelled out in the written quote. Manufacturer warranties on composite decking or hardware are separate and passed along at the time of purchase.
Who will I be dealing with once the deck project starts?
One point of contact manages a deck project from the initial quote through final inspection, so questions during the job go to the same person each time. Crew members on-site can answer day-to-day questions, but scheduling and change requests go through the main contact.
What decking materials are used?
Pressure-treated pine, cedar and composite brands like Trex and TimberTech are all used depending on budget and maintenance preference. Railing materials include wood, aluminum and cable, each with different code requirements for spacing and height.
Can I still use my yard or house while the deck is being built?
The area directly under and around the deck footprint is off-limits during framing for safety, but the rest of the property stays usable. Access to doors near the deck may be blocked temporarily on days when the ledger board is being attached or decking is being laid.
What do I need to do to prepare the property before work starts?
Clearing furniture, planters and grills off the existing deck or the build area is the main preparation before a crew arrives. Sprinkler lines, pool equipment and underground utilities near the build site should be pointed out during the estimate visit.
What happens if rot or damage is found once the old deck is torn out?
Hidden rot in ledger boards, rim joists or posts sometimes isn't visible until the old decking comes off, and that gets flagged before any new material goes on top of it. Additional repair needed beyond the original quote is priced separately and approved before work continues.
How should a finished deck be maintained?
Pressure-treated wood decks want restaining every one to two years and an annual check for loose fasteners or soft boards, especially near ground contact posts. Composite decking requires occasional washing to clear pollen and mildew but no sealing or staining at all.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (941) 337-0191